The interior maze continues. Stairs that go up to designated bedrooms and bathrooms are framed in and the bonus room over the garage is huge. As we walked down the stairs going to the lower…
Our house is framed and the roof shingles are being installed. What fun it is walking through the interior maze of 2 x 4’s and envisioning the completed rooms; the wall colors, cabinets and even…
The sun is shining and the framing materials have been delivered along with the trusses. The roughing crew is on site and they are simply amazing. In a day the blue prints were reviewed and…
April Showers bring May flowers…what do May showers bring? A delay in the building process! The basement is in and now we are waiting for a break in the weather to start the framing. On…